topright
Lexton | Print |

 


icon Stage 1 Water Restrictions Lexton (1.71 MB)

Notice is hereby given that Central Highlands Region Water Corporation has adopted Stage One of By-Law No. 404, which restricts the use of water in the Lexton Water Supply System. The restrictions come into force at 12.00 noon, Monday 23 November, 2009 and shall remain in force until withdrawn or varied. Download a summary of Stage One restrictions icon Lexton Stage One Legal Notice November 23rd 2009 (1.71 MB)

Lexton has 99 water connections and delivers approximately 18 million litres of water to those connections per year.

The Lexton water supply is sourced from the Lexton Reservoir.  Springs in the catchment make the yield reliable although water restrictions have been required on occasions.  Water in the reservoir has high levels of natural colour and dissolved salts.

Lexton's water supply has no added fluoride to the water supply. Any fluoride in the water supply is from natural sources.

Long Term Water Supply Strategy

icon Lexton Water Supply System Strategic Plan 2006-2055 (328.56 kB) 

 

 

 

 
13water

2008 Central Highlands Water All Rights Reserved